Thursday, October 1, 2009

BMP Trivia Question

Existing forest roads that were constructed in the past are often called "Legacy Roads." Because the science and understanding of Best Management Practices was not as evolved then as it is now, these roads can be very problematic to use, maintain, or upgrade. Can you think of three factors that might be considered "red flags" when deciding whether or not to use a Legacy Road?

(Note: Legacy road considerations are discussed in the Texas Forest Service's "Road BMPs" Workshop - visit the Texas Forestry Association website for a schedule of course offerings)

Click on "comments" below and post your answers.


Tuesday, September 1, 2009

The Texas Water Source - September 2009

September Issue of the Texas Water Source Now Available


September BMP Q&A

By: Chris Duncan, BMP Forester (Ret.), Texas Forest Service

Q:  Last month I addressed some of the tools that are available to use as planning aids for forest road design and layout.  This month I would like to address some planning factors to consider before road construction begins.  Next month I will address the construction phase for forest roads.

A:  Methods to control potential nonpoint source pollution from forestry activities starts with the careful planning of the layout of all operations.  The planning process of any forestry activity is extremely important.  A good plan should maximize efficiency, minimize traffic, preserve soil integrity, and protect water quality.  The following are some of the factors to consider during the planning process.

Are there any previously constructed roads on the property?  If there are previously constructed roads available, it may be less expensive to use the existing road system.  If the existing roads are in good shape, there is a potential for lower water quality impact issues than if you were to push in a new road.  It is important to realize that using “legacy” roads may not always be the best option.  When considering whether or not you can utilize an existing road, there are several factors which may be red flags including:  poor location, not stabilized/washing, poor access to the tract, below grade road.

Another factor to consider is whether your roads will be permanent, temporary, or a combination of the two.  Generally; permanent roads are more expensive to construct,   will require more planning, and will require periodic maintenance.  Temporary roads are constructed for a specific job, and are closed or retired after that operation is complete.

What will be the intended traffic for the road?  This is an important factor, and can also help in determining if the road will be permanent or temporary.  Will the road be used as a skid trail, or will there be heavy truck traffic using it?  It may also be helpful to talk with the landowner and determine if they need access to the tract after operations are complete.  Determine if there will be hunters or ATV riders using the roads or if there will be a considerable amount of vehicles (cars) using the road.

Other factors to consider before road construction begins include but are not limited to:
  • Topography - Steep topography will require more water control structures, while flat terrain may have “ponding” issues.
  • Soil Type – Some soils aren’t stable enough to support equipment. Sandy soils are generally more erosive than clays
  • Erosion/Sedimentation Potential- How likely is it that erosion will occur? Are there any streams nearby that may be adversely affected by erosion? 
  • BMPs/Stabilization - What BMPs will I have to use to stabilize road?

These are just a few of the factors which should be considered before any road construction begins.  I encourage you to attend one of our upcoming BMP Forest Roads Logger Training Workshops for more information.

For more information on forest road BMPs and other BMPs visit the Texas Forest Service webpage at http://texasforestservice.tamu.edu/water, contact me at (903) 297-3910.

* This article was published in the September 2009 issue of the Texas Logger

Saturday, August 1, 2009

August BMP Q&A

By: Chris Duncan, BMP Forester (Ret.), Texas Forest Service

Q: A few months ago you mentioned that there was a new logger training workshop focusing on forest roads. I have attended both the stream crossing workshop as well as the traditional BMP workshop several years ago. I would like to attend the new workshop when time will allow. In the meantime are there any pointers you could give my company in regards to forest roads?

A: Glad to know that you have attended both the BMP and Stream Crossing workshops. I hope that the information you learned at the workshops has benefited you on your logging operations since then. We should be having another forest roads workshop in the near future. I would be glad to give you some helpful information in the meantime. Over the next few months I will talk about the planning, construction and maintenance of forest roads.
The planning process of any forestry activity is extremely important.  This stage allows you to layout your operations in the most productive, economical, and environmentally sensitive manner possible.  The time spent on planning road design and layout will prove to be invaluable to your business.  The following tools discussed below should be used when available, and are available for your use at little or no charge.

Aerial photographs can be extremely helpful in viewing the entire landscape before any work is done.  These tools can show you the location of existing roads, streams, structures, land uses, and even timber types.  It is important to remember that aerial photographs are a snapshot in time, and are only as good as the date they were taken.  This means that some features on a photo may change in the future, however roads and streams usually remain constant.  These photos are available at the Texas Forest Service, tax assessor’s office, and the Internet.

Topographical maps are also important to use during this process.  These maps show changes in elevation through a series of contour lines.  This can be helpful when laying out the road systems, estimating BMP costs, and avoiding wet areas and steep slopes. Blue line streams are also easily designated on these maps, taking some of the guesswork out of determining if stream crossings can be avoided.  You can obtain these maps from hunting stores, state and federal agencies, and the Internet.

Soil surveys are another tool that can provide a lot of information to contractors.  These books, published by the NRCS, classify the different soil types that are found in an area.  A general description of each soil type is included, along with many charts that contain more detailed information regarding flooding frequency, duration, equipment operability, and much more.  Knowing and understanding the soil type of the property that you are working on can be a tremendous help. For information about ordering or obtaining information about reference copies (CD-ROM or paper copy), contact: tx-nrcs-soils@tx.usda.gov. You can also get soil data from the Web Soil Survey website at: http://websoilsurvey.nrcs.usda.gov/app/HomePage.htm.

Of course nothing beats actually visiting the site in person!  Use the above mentioned tools to get an idea of what you may encounter at the site, and use that information to help you plan your road layout.

For more information on forest road and other BMPs visit the Texas Forest Service webpage at http://texasforestservice.tamu.edu/water, contact me at (903) 297-3910.

* This article was published in the August 2009 issue of the Texas Logger

Wednesday, July 1, 2009

BMP Trivia Question

Streamside Management Zones (SMZs) are areas maintained on each side of perennial and intermittent streams. While SMZs provide many benefits, their primary purpose is to provide a relaivly undisturbed zone of forested buffer to filter sediments from adjacent forest operations, maintain streambank stability, and provide shade to maintain cooler water temperatures. The minimum SMZ width on each side of a perennial stream and on each side and above the head of an intermittent stream should be 50 feet. SMZ horizontal width is measured in linear feet from the stream __________ to the toe of a road, skid trail, or other surface disturbance.

Click on "comments" below and post your answers.